Krause & Hall
Krause & Hall Ltd
Services About
TestimonialsPolicies We're Hiring Contact
Message Us
Past Project Case Studies

Proof, On The Ground.

A selection of OLE installation, maintenance and incident-response works delivered for BAM, Taylor Woodrow, Story Rail, Nottingham Trams and Manchester Metro.

BAM

Scrubs Lane & Mitre Bridge Works

MAR 2023 – OCT 2024 · NR12
  • Provision of full turnkey OLE installation team inclusive of CRE-C
  • Mitre Bridge: re-sectioning of OLE and modification of earthing and bonding system
  • Scrubs Lane: replacement of failing OLE switching structure and re-anchoring of wire runs
  • Works on both projects undertaken within highly constrained access windows
  • Testing and commissioning of the modified OLE
  • All OLE installation and commissioning works, earthing and bonding works
  • Material supply and fabrication

Kentish Town Bridge Replacement Works

JUN 2023 – MAR 2024 · NR12
  • Provision of full turnkey OLE installation team inclusive of CRE-C
  • Undertook OLE and bonding modifications in support of the overbridge renewal
  • Material supply and fabrication

Story Rail

Lindsell's Level Crossing — New Footbridge

NOV 2020 – FEB 2023
  • Provision of full turnkey OLE installation team inclusive of CRE and PE
  • Bonding, OLE adjustments & component renewals and material supply
“Krause and Hall provided a service when Story's needed it most, providing PE and CRE nominated staff through to the full installation team. Responsive and full of enthusiasm to get the job complete safely and within budget. Great work from the Krause and Hall team, would certainly recommend for future works.” PROJECT AGENT, LINDSELL'S CROSSING PROJECT — STORY RAIL

Apperley Bridge — Platform Extensions

MAR – JUN 2024 · NR12
  • Provision of full turnkey OLE installation team inclusive of CRE and PE under PACE
  • Installation of bespoke cast in-situ concrete foundations
  • Installation of new OLE structures and transfers/removal of existing structures
  • All earthing and bonding works, material supply and fabrication
  • Works completed ahead of programme

Kirkstall Forge — Platform Extensions

MAR – SEP 2025 · NR12
  • Provision of full turnkey OLE installation team inclusive of CRE and PE under PACE
  • Installation of piled foundations
  • Installation of new OLE structures and transfers/removal of existing structures
  • All earthing and bonding works, material supply and fabrication
  • Works completed ahead of programme

Taylor Woodrow

Bletchley Depot — Phase 1

FEB – JUN 2023 · NEC4 OPTION A
  • Provision of full turnkey OLE installation team inclusive of CRE-C
  • All project and isolation planning, material supply
  • Installation of 4 bespoke anchor structures and mass concrete foundations
  • Installation of new piled foundations and structures
  • Re-anchoring, modification and adjustment to OLE and bonding
  • Staged de-wirement of sidings and removal of circa 30 structures, inclusive of large multi-track portals
  • Works completed ahead of programme

Bletchley Depot — Phase 2

NOV 2023 – DEC 2024 · NEC4 OPTION A
  • Provision of full turnkey OLE installation team inclusive of CRE-C
  • Project and isolation planning as required
  • Material supply and installation: 38 piled foundations, 4 bespoke concrete foundations (circa 30m³ each), 56 new structures ranging from STC masts through to multi-track anchor portals, 4500m of new conductor, 9 isolators, 10 section insulators
  • All traction bonding
  • Testing and commissioning of the new depot OLE and entry into service
  • Handed into service with zero snags

Nottingham Tram (NET)

Cinderhill — Contact Wire Replacement & Assessment

LINE 1 · BB LIGHT RAIL DESIGN RANGE

Client identified excessively worn contact wire within an area of extreme track geometry. Scope was to replace the contact wire, along with an engineering assessment and solution to provide extended contact wire life post-renewal.

  • Provision of full turnkey OLE installation team
  • Working with our design partners, we presented an assessment and solution based on reduced tension in the affected tension length, along with geometry adjustments to improve contact wire life

Bulwell — Derailment Recovery

LINE 1 · BB LIGHT RAIL DESIGN RANGE

Supporting the operator with the recovery of services following a significant derailment at Bulwell tram stop.

  • Provision of full turnkey OLE solution in support of the incident
  • Rapid response, including mobilisation of teams to make OLE safe and ready for tram recovery
  • Assistance in recovery strategy and reinstatement of the OLE system following recovery of the damaged tram
  • Working with our design partners, provided an assessment of the existing foundation along with proposed solutions for reinstatement: new foundation and design, re-use of existing foundation, or assessment of existing foundation

Beeston — De-wirement Recovery

LINE 2 · ALSTOM DESIGN RANGE

Supporting the client with the recovery of services following a significant de-wirement caused by a road vehicle in Beeston.

  • Provision of full turnkey OLE solution in support of the incident
  • Rapid response, including mobilisation of teams to make OLE safe
  • Assistance in recovery strategy and timely, safe reinstatement of the OLE system

Maintenance Support & Alterations (Various)

SINCE 2007

Since the company's formation in 2007, we have supported the team at NET with numerous instances of infrastructure alterations necessitated by development or demolition of adjoining buildings and structures, ranging from installation of temporary structures and foundations through to wholesale transfers to new structures, along with supply of staff, tools and machinery for targeted support in undertaking maintenance activities.

Manchester Metro

Queens Road Depot — Snagging & Completion Works

BRACKNELL WILLIS / MORSDORFER DESIGN RANGE

Supporting the client with the completion of snagging and completion works on the OLE following significant infrastructure changes within the depot.

  • Completion of all outstanding works and defects, including traction bonding alterations
  • Challenging working environment with extreme radial loads

We can demonstrate a broad and flexible capability, working across both "on street" and ballasted track areas, providing light rail clients with a turnkey solution, or labour and plant supply only. Our teams have in-depth knowledge and experience working on a number of OLE systems for light rail operators, which can be quickly and efficiently mobilised to realise clients' requirements.

Got a project that needs specialists?

MESSAGE US